Major Surgery, Part 2

Here’s the Sunday update. I got a bit of a late start because I had to run out to get supplies, but put about 7 solid hours in. First up was bending the metal to fit and getting things aligned.

When I had it squared up and ready, I looked over the barrel from the old vent and cut the rusty metal off the edges. What remained clearly wasn’t enough to make a template from, so I took measurements from the driver’s side and built a new template. With that cleaned up and bent, I tacked it together and continued shaping it correctly to fit.

When I had it set up correctly, I bent the mount for the vent cable stay and welded a support to that so it wouldn’t move.

Then I spent about an hour tweaking the barrel, test fitting it, tweaking it some more, and finally being satisfied with the way it fit. When I had it the way I liked it, I dialed in the welder and started tacking around the edges. This took time, and I did wind up warping the metal a little bit, but nothing I can’t work around.

When I had that the way I liked it, I started trimming a section of metal for the back wall. I bent several sections of the rear section upwards so that I can use that to help secure the whole structure. Then I hit the bottom of the vent with etching primer and seam sealer, and I’m letting it dry overnight. Tomorrow I’m going to start tacking it into place and getting things ready to install permanently.

Posted on   |    |  Posted in Travelall, Welding

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>